CONTENTS (38kb) Figure 5.3 - Average Weekday Traffic Forecasts with £1.40 Car Toll A19 Screenline Flows (1.69mb)
Figure 1.1 - Proposed Site Location (2.26mb) Figure 5.4 - Extent of Assessment of Traffic Changes (1.99mb)
Figure 2.1 - Cross Tyne Studies: Possible River Crossing Locations (1.35mb) Figure 6.1 - Noise Monitoring Locations, North Tyneside (1.74mb)
Figure 3.1 - New Tyne Crossing Alignment (1.49mb) Figure 6.2 - Noise Monitoring Locations, South Tyneside (1.75mb)
Figure 3.2 - New Tyne Crossing Alignment, North Tyneside (1.45mb) Figure 6.3 - Construction Noise Prediction Locations, North Tyneside (1.40mb)
Figure 3.3 - New Tyne Crossing Alignment, South Tyneside (1.61mb) Figure 6.4-7.1 - Predictions, Effects and Air Quality Receptor Locations (6.74mb)
Figure 3.4 - Cut and Cover Tunnel Construction (847kb) Figure 7.2-8.2 - Air Quality Receptor Locations, Landscape Assessment Character Areas and Proposals (6.41mb)
Figure 3.5 - Extent of the Main Working Area, North Tyneside (1.77mb) Figure 8.3-9.5 - Jarrow, Existing Landscape and Reinstatement Proposals, Historical Maps and Archaeological Assessment (5.31mb)
Figure 3.6 - Extent of the Main Working Area, South Tyneside (1.71mb) Figure 9.6-11.4 - Listed Building Locations, Employment, Community and Recreational Resources, Rights of Way and Community Severance During Construction (6.68mb)
Figure 3.7 Immersed Tube Construction (1.14mb) Figure 11.3 - Public Rights of Way: Footpaths and Cycleways (1.52mb)
Figure 5.1 - Junctions Analysed (1.33mb) Figure 11.5-15.2 - Buildings to be Demolished, Nature Conservation, Ecological Sampling and Surveys (8.46mb)
Figure 5.2 - Average Weekday Traffic Forecasts with £1.40 Car Toll Cross Tyne and A19 Flows (1.68mb) Figure 16.1-19.1 - Contaminated Land, Geological Cross Section, Landfill, Drainage and Waste Disposal (5.44mb)

 

Volume 1

Volume 3a

Volume 3b

Volume 3c