New Tyne Crossing Logo Graphic of New Tyne Crossing
Building it
News
Will it affect me
Operation
Documents
Keeping in touch
Building it
only search NTC
On the north bank
On the north bank

In the vicinity of the existing Metro bridge, the proposed scheme would provide a new toll plaza for southbound traffic near to the East Howdon bypass. Toll booths would be provided along with offices, car parking and garage facilities for tunnel staff and vehicles. A vehicle inspection area would be provided and any vehicle prohibited from entering the tunnel would be directed to the East Howdon Bypass via a newly constructed access road.

The scheme would then extend south through an open cutting for a distance of approximately 650 metres as far as the tunnel entrance. At this point, the road would enter a cut and cover tunnel section, approximately 320 metres long which would extend as far as the river bank, where (Point A) it would connect with the immersed tube positioned within the river bed.

The existing toll plaza at the northern end of the tunnel would be re-configured to accommodate northbound traffic only.

   In This Section
Construction
In the river
On the north bank
On the south bank
 

Text size:

select the default text size for the site this setting will be remembered at your next visitselect the larger text size for the site this setting will be remembered at your next visit  
© Copyright NTC 2005 Home  |  Legal Disclaimer  |  Top of Page  |  Contact Us