| CONTENTS
(38kb) |
 |
Figure
5.3 - Average Weekday Traffic Forecasts with £1.40 Car Toll A19
Screenline Flows (1.69mb) |
 |
| Figure
1.1 - Proposed Site Location (2.26mb) |
 |
Figure
5.4 - Extent of Assessment of Traffic Changes (1.99mb) |
 |
| Figure
2.1 - Cross Tyne Studies: Possible River Crossing Locations (1.35mb) |
 |
Figure
6.1 - Noise Monitoring Locations, North Tyneside (1.74mb) |
 |
| Figure
3.1 - New Tyne Crossing Alignment (1.49mb) |
 |
Figure
6.2 - Noise Monitoring Locations, South Tyneside (1.75mb) |
 |
| Figure
3.2 - New Tyne Crossing Alignment, North Tyneside (1.45mb) |
 |
Figure
6.3 - Construction Noise Prediction Locations, North Tyneside (1.40mb) |
 |
| Figure
3.3 - New Tyne Crossing Alignment, South Tyneside (1.61mb) |
 |
Figure
6.4-7.1 - Predictions, Effects and Air Quality Receptor Locations (6.74mb) |
 |
| Figure
3.4 - Cut and Cover Tunnel Construction (847kb) |
 |
Figure
7.2-8.2 - Air Quality Receptor Locations, Landscape Assessment Character
Areas and Proposals (6.41mb) |
 |
| Figure
3.5 - Extent of the Main Working Area, North Tyneside (1.77mb) |
 |
Figure
8.3-9.5 - Jarrow, Existing Landscape and Reinstatement Proposals, Historical
Maps and Archaeological Assessment (5.31mb) |
 |
| Figure
3.6 - Extent of the Main Working Area, South Tyneside (1.71mb) |
 |
Figure
9.6-11.4 - Listed Building Locations, Employment, Community and Recreational
Resources, Rights of Way and Community Severance During Construction (6.68mb) |
 |
| Figure
3.7 Immersed Tube Construction (1.14mb) |
 |
Figure
11.3 - Public Rights of Way: Footpaths and Cycleways (1.52mb) |
 |
| Figure
5.1 - Junctions Analysed (1.33mb) |
 |
Figure
11.5-15.2 - Buildings to be Demolished, Nature Conservation, Ecological
Sampling and Surveys (8.46mb) |
 |
| Figure
5.2 - Average Weekday Traffic Forecasts with £1.40 Car Toll Cross
Tyne and A19 Flows (1.68mb) |
 |
Figure
16.1-19.1 - Contaminated Land, Geological Cross Section, Landfill, Drainage
and Waste Disposal (5.44mb) |
 |